The project is anticipated to be constructed in 2 phases.
Phase 1
Phase 1 incorporates a mix of high- end apartment types above a mix of commercial space and amenity areas for residents.
Phase 2
Phase 2 is composed of Serviced Apartments, offices and associated facilities.
The development incorporates basement levels and a podium for parking and auxiliary facilities. There is a total of 1169 parking spaces.
Apartments mix and sizes (please also refer to the schedule of areas later in this report)
Average sizes:
ULTIMA 3 BHK apartment: 127 m2 1,363 ft2
LUXURIA 4 BHK apartment: 143 m2 1,541 ft2
PRESTIGE 195 m2 2,098 ft2
GRANDEUR 290 m2 3,119 ft2
SKY VILLA 528 m2 5,680 ft2
Quantity: The architecture consists of a 21 storey apartment block separated and served by 4 principle core positions. Smaller apartments are generally configured at the lower levels of the tower with Prestige,Grandeur and Sky Villa apartments to the upper floors. There is currently a total of 200 apartments composed of:
ULTIMA 82 apartments
LUXURIA 46
PRESTIGE 35
GRANDEUR 21
SKY VILLA 16
The Phase 1 design also includes 4,000 m 2/ 43,053 ft2 of commercial space.
Phase 2 has the following principle carpet areas:
Serviced Apartments 40 units 1,461 m215,726 ft2
Offices 48 units (variable) 4,806 m2 51,726 ft2
Additional parking and amenity areas and facilities are given separately.
|
Rehabilitation Project
|
Nandurga, Killari, Narangwadi and Naichakur |
 |
Project Description : Construction of Houses Roads, Drains at relocated villages Nandurga, Killari,
Narangwadi and Naichakur under Earthquake Rehabilitation Projects in
Maharashtra (IV Package)
Name of Dept : Executive Engineer, I.U.E.R. division No. 1, Nilanga (M.S.)
Amass housing project over 2500 house swell constructed within time frame.
Costing : Rs. 2850.00 Lacs
|
|
|
|
|
Adhoi, Taluka Bhachau |
Project Description : Construction of various types of houses in village Adhoi, Taluka Bhachau, Distt.
Kachchh, Gujarat (PackageHSG/ADHOI/3)
A mass housing project completed in record time.
Name of Dept : Chief Engineer, Gujarat Earthquake, Rehabilitation Cell,
Mumbai (M.S.)
Costing : Rs. 1018.00 Lacs.
|
|
|